What isMullaperiyar Issue?

The Mullaperiyar Dam was constructed by the British during 1887-1895 across Periyar River in the then Travancore state (now Kerala) territory. The dam, with full reservoir level of 152 ft. provides for diversion of water from the reservoir through a tunnel to Vaigai basin in Tamil Nadu for irrigation benefits. A 999-year lease was made, and accordingly, the Tamil Nadu government has been operating the dam. The Periyar power station in TN produces hydro-electric power from these waters and distributes that electricity in the state.

In 1979, there was an earthquake in the dam area that caused panic among people. On Kerala Govt’s request, Tamil Nadu agreed to reduce the water level to 136 feet from 142 feet, till completion of strengthening of the dam with reinforcement of concrete cover, etc. Post completion of reinforcement work, Tamil Nadu wanted to increase the water level back to the original 142 feet. However, continuing tremors in the area caused concerns among people living downstream that this lime and surki dam of such vintage may not survive a major earthquake.

Petitions were filed for, and against, raising of water levels in the dam. These petitions before Kerala and Madras High Courts were subsequently transferred to the Supreme Court for decision. The Hon’ble Supreme Court took a strict legal view in these cases and permitted raising of water to the level, permitted under the agreement i.e 142 feet.However, continuing tremors in the area and increasing leakage from the dam (even after all the reinforcement work) caused public outrage and concern among the people living downstream. The Government of Kerala was forced to pass a law (applicable to all the dams in the State), and thereby stop the efforts of Tamil Nadu to increase the water level to 142 feet and eventually to the maximum capacity of 152 feet.


comments powered by Disqus